Project Overview

Job Date: August 2003

This project involved a single-storey extension, including new openings in the kitchen and living room, with careful planning around sewer drainage and building control compliance.

Extension plans


Sewer Drainage and Manhole Construction

We assessed existing sewer runs, relocated soil drains, and constructed a new manhole aligned with the main sewer. Concrete base, engineering brick walls, and P-shingle support were used for stability. Connections included the kitchen, bathroom, and washing machine.

Manhole example


Foundation Work and Soakaway Installation

Excavation and shuttering were completed carefully near existing sewer drains. A soakaway was constructed with honeycomb brick walls, filled with hardcore and covered with garden fabric, soil, and turf. Pipes from gullies were laid into the soakaway structure and surrounded with P-shingle for support.

foundations
Foundations
foundation shuttering
digger
soak away
soak away
soak away


Damp Proof Course and Blockwork

We installed a new DPC, built engineering brick walls up to DPC level, and bridged gaps with pre-stressed lintels.

prestressed lintels
brickwork proceeding


Oversite (Flooring) Preparation

Floor leveled with ballast and sand, damp proof membrane laid, then polystyrene insulation boards installed and topped with 4 inches of concrete to form an insulated subfloor.

oversite


Wall Construction and Insulation

Cavity wall brickwork with Rockwool insulation, wall ties, lintels above openings, and vertical DPCs tied into the existing structure.

wall construction
brickwork proceeding


Roof Plate, RSJ, and Joist Installation

Wall plates fixed, RSJs installed with padstones, jiffy hangers for joists, fire-resistant paint applied, and firring pieces added to create roof slope.

acrow props
acrow props with stronboys
prop support
RSJ fitted
opening
second opening


Warm Deck Flat Roof

Kingspan insulation bonded to plywood, three layers of torch-on felt applied, lead flashing installed, and PVC fascia boards fitted with green mineral drip edge.


Window and Door Installation

UPVC windows and doors fitted with spacers, rawl plugs, and expanding foam to secure and seal frames.

upvc doors
rear extension


Electrical and Internal Works

Cabling, back boxes, conduit, stud wall, door frame, ceiling boards, plastering, and scrim taping completed to building regulations standards.


Heating and Floor Screeding

Boiler installed, pipework routed, floor screeded over insulation, manhole cover set flush, and leveling compound applied for a smooth finish.

boiler installation
single storey extension


Final Finishes

Skirting boards, architraves, internal and French doors installed. Painting to be done by customer, with plaster sealed with watered-down emulsion for optimal finish.

french doors
single storey extension
extension work
single storey extension


Conclusion

This extension involved extensive groundworks, structural planning, and interior finishes. Careful attention to detail and compliance with building regulations ensured a long-lasting, functional, and comfortable home addition.